Our Services

Plumbing Installations

Certified plumbing systems, water management, and fixture installations.

Reliable Plumbing Installations in Malta

Our certified plumbers lay all hot and cold water supply lines, install drainage and waste systems, and connect all sanitary fixtures across Malta. We coordinate closely with electricians and tilers to ensure everything is in place before walls and floors are closed. We serve properties in Naxxar, MellieΔ§a, Attard, St. Paul's Bay, Sliema and all surrounding areas.

From a single apartment bathroom to a full villa fit-out with multiple bathrooms, kitchen, laundry and outdoor supply points, we handle it all with pressure-tested precision.

What Our Plumbing Service Includes

  • Hot and cold water supply pipe routing
  • Drainage and waste pipe installation
  • Shower tray and bath installation
  • Toilet, basin and bidet connection
  • Boiler and water heater connections
  • Kitchen sink and dishwasher supply
  • Washing machine and tumble dryer connections
  • Outdoor tap and garden irrigation points
  • Water pressure testing and commissioning

Materials We Use

  • PPR and Acorn (push fit) pipe for hot and cold supply
  • PVC and soil pipe for waste drainage
  • Brass isolation valves and fittings
  • Flexible hoses for fixture connections
  • Insulation for hot water pipes to prevent heat loss
  • Pressure-tested compression fittings

Why It Matters

All plumbing must be completed and pressure-tested before tiling and waterproofing. A leak discovered after tiles are laid means breaking out finished work β€” costing time and money. Our systematic approach ensures all pipes are correctly routed, supported and tested before any surface finishes are applied.

Frequently Asked Questions β€” Plumbing Installations

We use PPR (Polypropylene Random) or push-fit Acorn pipe for supply lines β€” both are rated for hot and cold water with a long service life and excellent reliability in Malta's conditions.

Plumbing rough-in and pressure testing must always be completed before waterproofing. Waterproofing is then applied over the tested pipe locations; tiling follows after that. Getting this sequence wrong creates serious problems with leaks and repairs later.

Yes β€” we handle all connections to boilers, water heaters and in-line heaters, coordinating with other trades to ensure the supply and return pipework is correctly routed and insulated.

We pressure-test all supply lines using a manometer gauge, holding pressure for a minimum of 30 minutes before any plaster or screed is applied. Any drop in pressure is investigated and resolved before surfaces are closed.

Yes β€” we lay the UFH pipe loops, connect manifolds and pressure-test the system before screed is poured. Correct pipe spacing and coverage depth are essential for efficient heat distribution.